fbpx

Installed

These are air conditioning units installed on a back to back basis. The installation is usually conducted within 40 km from our office location. The installed option allows us to include brackets, 1 length of drain as well as the labour associated with a back to back install. The indoor unit should be right in front of the outdoor unit for the installation to be classified as “back to back”. We do also include a 3 metre power cable allowance for our installed deals to a power point however it does not include electrical to the DB which is required a standard. Any additional materials required onsite above the back to back installation will be charged out accordingly based on communication from the team. As a standard we ensure that the team onsite will advise the person onsite of extras required prior to commencing with any installations.

Showing all 5 results